Below is a list of  Horizon Resources International’s past and present projects.


Rig Audits / Project Management / Training / Environmental Services

Year

Location

Project

Personnel

2013 - 2016

Korea

Construction Supervision of MOSS MARITIME CS60E Harsh Environment semisubmersible drilling rig

Engineering Manager

Commissioning Manager

Drilling Systems Supervisor

Electrical Supervisor

Electronics Supervisor

Coatings Inspector

Structural Inspector

Welding Inspector

Piping Inspector

Project Engineer

Mechanical Supervisor

Subsea Supervisor

Software and Control Systems Supervisor

Software and Control Systems Assessor

2012 - 2015

Singapore

Construction supervision of 4th Gen Victory class semisubmersible drilling rig


Electrical Supervisor

Project Engineer

Assistant Project Engineer

Commissioning Manager

Electrical Commissioning Supervisor

Mechanical Commissioning Supervisor

Subsea Commissioning Supervisor

Electrical Inspector

2011 - 2015

Korea

Construction of four Gusto P-10000 dynamically positioned (DP3) Drill Ships

Project Manager

Drilling Engineer

Commissioning Coordinator

Project Engineer

Graduate Engineer

Mechanical Supervisor

Subsea Supervisor

Drilling Systems Supervisor

Electrical Supervisor

Electronics Supervisor

Coatings Inspector

Structural Inspector

Welding Inspector

Piping Inspector

2015

Norway

Hardware in Loop Testing (HIL) Supervision

Software and Controls Specialist

2015

USA

BOP FAT Supervision

Subsea Specialist

2015

Korea and USA

DP and Power Management Acceptance Testing

Electrical Engineer / DP Specialist

2014 - 2015

China and USA

Supervision of fabrication and testing of 32 x azimuth thrusters up to 5MW rating.

Mechanical Engineer

2014 - 2015

USA

Machinery Failure Root Cause Analysis

Mechanical Engineer

2014 - 2015

Korea

Supervision of fire testing for class rated shipboard doors and cable transits

Project Engineer

2014

Australia and USA

3rd Party independent Assurance on 1500 HP Ideal Prime rig constructed in Houston and imported to Australia. Maintenance management and critical spares review, Verification of Competency and FMEA on Drilling Systems

Project Engineer

Mechanical Assessor

Electrical Assessor

Electronics Assessor

DROPS Assessor

Training and Competency Assessor

2013 - 2014

Australia

Project Management of High Pressure High Temperature rig upgrade

Project Manager

2013 - 2014

Australia

Technical Project Management for the Commissioning of a new build 3000HP Land Rig

Technical Project Manager

Technical Writer

2012

Korea

Training course “Introduction to Drillships” for shipyard engineering personnel.

Drilling Engineer / Lecturer

2012 - ongoing

Australia and Brazil

Provision of 3rd party independent auditing and inspection of Drilling Rigs

Mechanical Assessor

Electrical Assessor

Expert Witness- Hazard Controls

DROPS Assessor

2011 - 2012

Australia

Manage and coordinate drilling rig and equipment surveys, rig acceptance and commissioning projects for various rigs and clients throughout Southeast Asia.

Area Manager

2011

Korea

Training course “Introduction to Drillships” for shipyard engineering personnel.

Drilling Engineer / Lecturer

2010 - 2011

Singapore

Manage and coordinate drilling rig and equipment surveys for various rigs and clients throughout Southeast Asia.

Drilling Engineer

2010 - 2011

Australia

Drilling engineering for coal seam gas drilling operations including horizontal, directional and in-seam intercept wells.  

Drilling Engineer

2010

Australia

Third party inspection coordination - Coal Seam Gas drilling equipment & operations

Drilling Engineer

2010

Korea

Training course “Introduction to Drillships” for shipyard engineering personnel.

Drilling Engineer / Lecturer

2010

Australia

Supervision of Coal Seam Gas drilling operations.

Drilling Engineer / Drilling Supervisor (Operating Company Representative)

2009

Indonesia

Indonesian government oil and gas inspectorate conference on requirements and benefits of maintenance management systems.

Drilling Engineer / Presenter

2009

Singapore

Training course “Introduction to Drillships” for Nanyang Technology University.

Drilling Engineer / Lecturer

2009

Singapore

Training course “Introduction to Drillships” for shipyard engineering personnel.

Drilling Engineer / Lecturer

2009

Singapore

Commissioning of two Friede & Goldman ExD Millennium DP2 semisubmersible drilling rigs.

Electrical & Electronics Supervisor

Commissioning Engineer

2008

Australia

Training course “Drilling equipment Selection” for petroleum engineering students at University of New South Wales.

Drilling Engineer / Lecturer

2008

Singapore

Training course “Introduction to Drillships” for National University of Singapore.

Drilling Engineer / Lecturer

2008

Singapore

Training course “Introduction to Drillships” for shipyard engineering personnel

Drilling Engineer / Lecturer

2007 - 2008

Singapore

Construction of KFELS Mod V B class jackup drilling rig

Electrical & Electronics Supervisor

Commissioning Engineer

2006 - 2011

Australia & Singapore

Technical and Grammar editing of drilling equipment survey reports

Grammar Editor

Technical Editor

Drilling Engineer

Drilling Equipment Surveyor

2006- 2009

Singapore

Upgrade of two Victory class semisubmersible drilling rigs to 5th generation capacity.

Electrical & Electronics Supervisor

Commissioning Engineer

New Software & Controls Integration and Test Plan Philosophy

Created a comprehensive test plan philosophy document for strategy & requirements, and followed up with a detailed test plan to execute against.

The Setting

Commissioning of Drillfloor equipment & software on the latest Cyberbase-controlled drilling control system.

Approach

Created an over-arching philosophy document that shaped the constructs of the commissioning test plans & objectives to increase efficiency & efficacy of testing efforts.

Elicited requirements

Match requirements with test procedures, and created additional test procedures to close any perceived gaps in tests

Included an additional focus on control system software, event messaging, alarm management, and log files

Executed commissioning test that were more thorough and detailed than previously used tests

Outcome

Much higher degree of software successfully integrating & controlling equipment than hoped for

Hardware & software integrated seamlessly which much fewer issues, and a higher success rate

Completed commissioning of drillfloor equipment & control system in a shorter amount of time than previous rigs with similar systems

Alarm Management Policy

Created a comprehensive test plan philosophy document for strategy & requirements, and followed up with a detailed test plan to execute against.

The Setting

Create a standards-based Alarm Management Philosophy document for construction phase of newbuild that could also be implemented fleet-wide to assure annunciated alarms would be actionable, clear, concise, provide operator ‘next steps’ information, and reduce nuisance alarms.

Approach

Created policy based on IMO 830, YA-711, and EEMUA based principles of alarm management, and also incorporated best practices

Elicited input from rig crews, operations management to gain rig-based information on what would be helpful to personnel when receiving alarms

Incorporated principles of alarm management into a policy that was also adjusted for rig-based equipment & systems

Inventoried all alarms, modified text of alarms to be clear & informative

Reviewed priority level of alarms, and frequency of annunciation, and the alarm set-points

Modified alarms with system vendor to achieve goals

Outcome

Reduced nuisance alarms to nearly zero

All alarms became useful and informative, and provided operator recommended actions for resolution

Complied with requirements of ABS, DNV, and alarm management standards

Operations adopted policy for all newbuilds, and plans to apply it fleet-wide

Hardware in the Loop (HIL) testing

Create environment to test control system software prior to commissioning.  The goal was to detect issues early enough to fix them with reduced cost, and ‘prove’ the software prior to commissioning.

The Setting

Vendor-provided environment that included a mix of control components (PLCs, Modbus, profibus, fiber optics, etc.) and simulation of signals and other components not yet available.

Approach

Adopted alarm management & software testing philosophies, and operational scenarios to thoroughly test software for normal use, but also stress test its effectiveness in error handling, alarms, log files, and extreme situations that could be considered nearly impossible (rare).

Looked for the software’s weak spots, times & situations where the software could fail and/or was never previously tested.

Outcome

Identified over 1000 issues related to functionality, error handling, HMI inconsistencies & errors, alarm handling, and test scenario gaps in tests.

Since testing was conducted several months prior to commissioning, all documented issues were put on a fix roadmap, and installed prior to commissioning.

Created more robust software that had been tested in more ways than ever previously, and ended up saving commissioning time, and money for our client.

Software & Control Systems Integrity